Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Muhammad Imran Taj Din Taj Din

Candidate ID: 1968999

Career Summary

Engineering Graduates/PG with 15 years experience in field of HVAC, Fire Fighting & Plumbing. I searching for full-time position as a Mechanical Engineer where I can demonstrate my technical and business skills and contribute to the company.

Skill Set

MEP

Professional Information

Total Experience : 15

Nationality : Pakistan

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

Curriculum Vitae

Muhammad Imran Taj Din
Saudi Arabia – Riyadh -Registered Member of Saudi Engineering Council-Mechanical Engineer

Mob: 00966 - 0530029872
Email: eng.imran222@gmail.com



OBJECTIVE


QUALIFICATIONS








TRAINING COURSES




PERSONAL DATA







WORK EXPERIENCE











TECHNICAL & OTHER SKILLS




































OTHER SKILLS



COMPUTER SKILLS




LANGUAGES

A full-time position as a Mechanical Engineer where I can demonstrate my technical and business skills and contribute to the company.

2000 – 2005 Department of Mechanical Engineer
(Mech. Power Refrigeration & Air Cond.)
University of Engineering & Technology
Pakistan Lahore
Bachelor of Technology - B - Tech (Hon)

Graduation Grade : Good.
Project grade : Excellent.


1. Hospital Fire Fighting System Design.
2. Fire Protection System Design.
3. HVAC Clean Room Workshop.
4. BMS Design Course


Nationality : Pakistan
Date of birth :15-05-1979
Marital Status : Married
Driving License : Available(Saudi Arabia)
Iqama No :2242166227



Total Work Experience 16 Years
Currently Working as SENIOR MECH. ENGINEER from July 2007 – Till Present with R. Sanabel Electro Mech. Cont. Co. - Riyadh







HVAC
• Supervision of Mechanical Works Installation such as HVAC System, Fire Fighting System & Plumbing Works.
• Installation of HVAC Equipment, Like, AHU, VAV, FAF, EF, SF, FCU, PACU, CHILLERS, PUMPS.
• Preparing and take approval of materials submittals, shop drawings, co-ordination drawing also as built drawings.
• Preparing all Project Documents such as (bill of quantities, quotations, Material Submittal, Variation Order, Shop Drawings).
• Have Good Knowledge Cooling/Heat Load Calculations.
• Chilled Water Piping Design.
• Pump Head Calculation.
• Ducting Design & Static Pressure Calculation.
• Air Grills Selections.
• Have Good Work Experience for HVAC Works Quantities Like Duct, Pipe, Grills & Other Installation.

FIRE FIGHTING
• Installation of Fire Fighting System “Wet Suppression System" Piping, Sprinklers, Fire House Cabinets, Landing Valves, Pumps, Fire Smoke System etc.
• Have Very Good Knowledge for Fire Sprinkler System.
• Sprinkler System Hydraulic Calculation.
• Have Very Good Knowledge for Fire Stand Pipe System.
• Fire Extinguisher.
• FM-200
• NOVEC-1234
• Foam System

PLUMBING
• Have Very Good Experience for Plumbing Works.
• Installation of Plumbing System, Sanitary Fixtures, Transfer & Booster Water Supply Pumps, Submersible Pumps.
• Sequence of Operation for High Rise Buildings Water Transfer Pumps, Booster Pumps.
• Have Good Knowledge for BMS related to MEP Equipment’s.
• Have Very Good Experience for Plumbing Works.
• Have good experience for BOQ, Change Order & Quotation preparation.
• Have Good Knowledge for Project Estimation.

• Good team-worker - adaptable and flexible
• Work under pressure
• Facilitate any Troubles to achieve my task


• Very good at AutoCAD
• Very good at using Office Applications.



• English (Fluent Speaking & Excellent Writing)
• Arabic (Good Working Knowledge)









ACCOMPLISHED & IN PROGRESS PROJECTS DETAILS
S.NO PROJECT COMMENCEMENT DATE PROJECT END DATE WORK FOLLOW UP LOCATION
HVAC FIRE FIGHTING PLUMBING
1 NURSING HOSTEL - HMG Dec-22 In Progress VRF System Complete Fire Fighting System Complete Plumbing Works RIYADH
2 OXYGEN GYM Mar-22 In Progress Package Air Conditioning System Complete Plumbing Works RIYADH
3 VILLA RUGAIB Aug-18 Sep-22 Chilled Water Air Conditioning System Complete Plumbing Works RIYADH
4 AL MAJDOUL TOWER Mar-13 In Progress Air Conditioning & Exhaust Duct Works Complete Fire Fighting System Complete Plumbing Works RIYADH
5 OUT PATIENT BUILDING Feb-12 Jan-13 Chilled Water Air Conditioning System RIYADH-KING FAHAD MEDICAL CITY
6 AL AMEED CAR SHOW ROOM Jun-11 Mar-12 Package Air Conditioning System RIYADH
7 AL HARAM MALL Dec-10 Jul-12 Package Air Conditioning System Complete Plumbing Works RIYADH
8 OTHAIM MALL Nov-08 Dec-10 Chilled Water Air Conditioning System DAMMAM
9 ONAIZAHA MALL Jul-07 Aug-08 Chilled Water Air Conditioning System AL QASIM
10 ORIENT GROUP Aug-06 Jun-07 HVAC Project Sales & Marketing AL QASIM