Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Anil Ankola

Candidate ID: 881747

Career Summary

I am bachelor in Electrical Engineering having 17+ years of strong working experience in India and abroad in detail engineering, procurement, construction and commissioning in oil and Gas, Refinery and Petrochemical Plants. I am looking job in Detail Engineering, Design.

Skill Set

Engineering, Procurement, Construction, Commissioning,Field Engineering, Site Survey, Site Support, Co-ordination, Shutdown, operation, maintenance

Professional Information

Total Experience : 17

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

CURRICULUM VITAE

ANIL ANKOLA Principal Electrical Engineer
anil2476@gmail.com
+91 8130 243 551
Skype ID : anil.ankola
Carrier objectives To obtain a position in an organization where my skills and experience will be an asset to help the company achieve their mission, vision and values
SUMMARY OF EXPERIENCE • A highly talented, dedicated and performance-driven Principal Electrical Engineer with an experience of more than 17 years in Detail Design, procurement, erection & commissioning, cost/ time effectiveness, requirement gathering, feasibility analysis,
• Diligent in completing of project in minimum turnaround time effective resource utilization to maximize the output
• Incredibly hardworking with strong track record of completing projects on time and within the allotted budget
• Demonstrated excellent communication, interpersonal, and organizational skills. Able to prioritize work effectively and efficiently
• Proven outstanding problem solving & analytical skills with well-rounded mathematical & electrical knowledge.
Total Professional Experience 17 Years +
Present Organization GS Engineering and Construction Delhi Pvt. Ltd. Gurgaon, India
----------------------------------------------------------------------------------------------------------------------------------
W O R K P O T E N T I A L

DETAIL ENGINEERING PROCUREMENT CONSTRUCTION COMMISSIONING
FIELD ENGINEERING SITE SUPPORT CO-ORDINATION SITE SURVEY
OPERATION MAINTENANCE SHUT DOWN PROPOSAL ENGG.

O V E R S E A S W O R K E X P E R I E N C E

COUNTRY ON OF YEARS ORGANISATION
KAZAKHSTAN 2.5 SAIPEM/ERSAI
QATAR 2 RAS GAS , QATEX (With MEDGULF WLL)
KUWAIT 1.5 KNPC(With ALMEER)
----------------------------------------------------------------------------------------------------------------------------------
CAPABILITIES TO EXECUTE THE WORK
132 KV Switchyard Soft Starters, VFD
11KV and 6.6KV Substations HVAC SYSTEM and BMS system
1000KVA & 1825 KVA DG Sets Substation Automation System (SCADA)
415V LV Substation Fire Alarm System
AUTO change over Panels PAGA System
UPS , Battery Chargers CCTV System
11KV Motors , 6.6 KV Motors, LV Motors ETAP / CYME Software (ETAP Certification)
Electrical Heat Tracing System Cathodic Protection System

----------------------------------------------------------------------------------------------------------------------------------
CODES AND STANDARDS
IEC IEEE NEC
NFPA KNPC (Kuwait) NACE
NEMA QCP (Qatar) SHELL
----------------------------------------------------------------------------------------------------------------------------------
DETAIL WORK EXPERIENCE INFORMATION

October, 2013 ~ Present Principal Engineer / GS Engineering & Construction India Pvt. Ltd.
AEGEAN REFINERY PROJECT (ARP) , TURKEY
CLEAN FUEL PROJECT (CFP) , KNPC, KUWAIT
? Preparation/review of engineering documents/drawings
? Substation Sizing calculation/ Panel board sizing, Cable sizing, UPS and battery sizing, Ground grid and lightning protection calculations, Lighting calculation
? System Study in ETAP software (Load flow, short circuit, Harmonics, relay co-ordination and protection study etc)
? Preparation of Load list, Single line diagrams, Trench / tray layouts, Power layout, cable schedule, Interconnection diagrams, grounding layouts, lighting Layout drawings.
? Preparation of MTO, RFQ for procurements
? Co-ordination with inter discipline & Site co-ordination.
? Technical evaluation of Electrical Equipments & finalization of Vendor / subcontractor
? Reviewing of Vendor Drawings/Document & clearance for manufacturing.
? CATHODIC Protection system input to vendor and vendor design review (Layouts, schematics, MTO etc).
? Electrical Heat tracing system input to vendor and vendor design review.
----------------------------------------------------------------------------------------------------------------------------------
August, 2010 ~ March, 2013 Sr./Lead Engineer / ERSAI Caspian Contactor LLC, Kazakhstan
Zhambyl Submersible Drilling Rig at Kazakhstan Jack up Drilling Rig at Kazakhstan
? Review of project scopes of work, schedules and specifications for Drilling Platforms, Jack up Rig and Submersible Rig.
? Detailed Design of electrical systems for onshore / offshore projects as per the applicable international/ Project standards.
? Preparation of Engineering Documents (Specifications, Data Sheets, Purchase specifications etc)
? Preparation of Load List, Design calculations (Cable Sizing Calculation, Lighting Calculation, Lightning Protection Calculation Preparation of Engineering drawings (Single Line Diagram, General Arrangements, Interconnection diagrams, Wiring Diagrams, Lighting Layout, Power Socket Layout, Cable route layout, Cable tray layout, Grounding Layouts, Support Drawings, Fire Alarm Layout etc)
? Preparation of Material Take off (MTO), Purchase Request and Technical Evaluation for finalization of vendors/products.
? Preparation of Cable Drum schedule.
? Reviewing of Vendor Drawings/Document as per project requirements and clearance for manufacturing.
? Inter disciplinary co-ordination (Process, Civil, Piping, Instrumentation, Structure and Mechanical) for detail design finalization.
? Raise Technical Query to clarify the site problems, clarifications, mismatching and discrepancies
? Estimation of Quantity required for New Project Bidding
? Estimation of Man hours for Engineering work, Erection and Pre-commissioning and Commissioning Activities
? Management of Electrical Subcontractor and monitoring the process of work.
? Technical discussion with client and consultant
? Preparation of Scope of work for Electrical installation activities for Subcontractors finalization.
? Design of CATHODIC protection system for mooring dolphin project on jetty.
? Preparation of drawing for sacrificial anodes and procurement and installation of system
? Preparation of drawing in AutoCAD and guide to Draftsman.
----------------------------------------------------------------------------------------------------------------------------------
Feb, 2008 ~ February 2010 Senior Engineer / MEDGULF Construction Co. WLL

RAS GAS Projects, Qatar
? 6.6 KV Substation SIEMENS make panel Extension work
? 415 Volts 4000Amps LV Switchgear two in comer & one bus coupler type Eaton HOLEC Panel engineering, Procurement, Erection & commissioning.
? 2X2500KVA Transformer ABB Make Hermetically sealed type transformer Engineering and Procurement,
? Chloride Make 64 Amps Battery Charger & 12KVA Redundant type UPS procurement, Erection & commissioning.
? MINILEC Annunciation Panel procurement, Erection & commissioning.
? Modification of Invensys make ELICS / DCS System , RTU Panel installation & Hook up with existing RAS Gas System
? GAITRONICS make fire Alarm system installation, Detector, Manual call point installation
? Siemens make BMS system installation & commissioning.
? Overhead Travelling Cranes Morris make (75, 50, 25 & 5 Tones)
11KV Substation work at QATEX Ltd. Qatar
? 11KV switchgear panel Schneider make procurement, Erection & commissioning.
? 11 KV Ring main Unit (RMU) Schneider make procurement, Erection & commissioning.
? 11KV 1020 KW pump motor set procurement, Erection & commissioning.
? 10 KVA CEG make Redundant Type UPS & 110 Volts Battery Charger procurement, Erection & commissioning.
? Testing of 11KV Switchgear, LV Switchgear and HT Motors etc.
? Lighting/EARTHING system work
? CATHODIC protection related work like installation of rectifier unit, Anode bed installation & checking etc. Preparation of method statement.
----------------------------------------------------------------------------------------------------------------------------------
Dec, 2006 ~ Jan 2008 Electrical Engineer / ALMEER Technical Services Pvt. Ltd.

Modernization of Electrical and Instrumentation at KNPC AHMEDI Refinery, Kuwait.
? Modernization of Electrical system from old electrical system to new system.
? Sizing of UPS (Chloride & GUTOR make), Sizing of battery bank , Cable sizing calculation, CPD single line diagram preparation and Equipment layouts preparations.
? Equipment specification & RFQ preparation.
? Detail engineering documentation preparation.
? Procurement of UPS, DC system, Transformer, PDB, Cables, Lightning & grounding material etc.
? Preparation of HOT loop cut over procedures for UPS replacement & battery banks etc.
? Replacement of old UPS system & Battery bank by new system during running plant by hot loop cut over.
? Replacement of old battery system by new one during running plant.
? Replacement of old fire alarm system by new system.
? Modification of switchgear feeder (installation of new feeder modules) of TOGAMI , AL-AHLIA , Mitsubishi Make
----------------------------------------------------------------------------------------------------------------------------------
Jan, 2005 ~ Nov 2006 Electrical Engineer / NIRMA Ltd. Baroda

Linearly Alkaline Benzene (LAB), Baroda, Gujarat
? Preventive, Predictive and Breakdown Maintenance Management of electrical power system for Process and Utilities plants.
? Operation and Maintenance of 132KV Outdoor Switchyard, 6.6KV substation, Power Transformers etc
? Operation and Maintenance of 6.6KV/415V Transformers, 6.6 KV switchgear Panel and LV switchgear Panels.
? Maintenance of MV motors, LV motors (Overhauling of motors and monitoring Vibration monitoring and temperature etc).
? Maintenance of UPS , Battery chargers & battery banks
? Maintenance of different sizes of 3 phase 415 volts AC LT motors up to 160 KW & MV motors up to 2620 KW motor
? Maintenance of Power transformers, Vacuum contactors, Vacuum circuit breakers & Air circuit breakers.
? Monitoring the transformer maintenance activities breakdown strength checking, silica gel color, transformer oil leakage.
? Management of Power Distribution system from main MV/LV substation to different plant process and utilities area.
? Maintenance of VCB, ACB and MCCBs.
? Maintenance of Lighting system, HVAC System etc.
? Modification jobs in LV panels for improvement.
? Monitoring of Power Factor for reduction of Electricity billing
? Preparation of shut down planning and management of manpower and material as per schedules.
? Co-ordination with local Electricity government authorities for invoice and maintenance activities.
----------------------------------------------------------------------------------------------------------------------------------
Oct, 2003 ~ Jan 2005 Sr. Executives / Gujarat Glass Pvt. Ltd.

Glass Plant at JAMBUSAR Gujarat
? Preventive, Predictive and Breakdown Maintenance Management of electrical power system for Process and Utilities plants.
? Operation and maintenance of 66KV outdoor type Switchyard.
? Operation and Maintenance of 3.2 MW Gas engine and synchronization with power Grid.
? Operation and Maintenance of Variable frequency drives (VFDs) up to 200KW
? Operation and Maintenance of Soft Starters for 200KW for compressors drives.
? Power Transformer 5 MVA, 66KV/11KV operation, routine maintenance activities.
? Maintenance of different sizes of single phase and three phase motors up to 500 HP.
? Motor load checking, overhauling, bearing replacement, vibration checking etc.
? Maintenance of VCB, ACB and MCCBs.
? Monitoring the transformer maintenance activities breakdown strength checking, silica gel color, transformer oil leakage.
----------------------------------------------------------------------------------------------------------------------------------
Oct, 2001 ~ Sept 2003 Electrical Engineer / ADANI WILMAR Ltd.

Edible Oil Refinery, MUNDRA, Kutch, Gujarat
? Preventive, Predictive and Breakdown Maintenance Management of electrical power system for Process and Utilities plants.
? Pre-commissioning, Commissioning, operation and maintenance of 66KV outdoor type Switchyard.
? 2 X 1250KVA Cummins make DG sets operation and routine maintenance.
? Calculating the HSD consumption/ KWH and implementing the different technique to reduce the HSD consumption/KWH
? Power Transformer 5 MVA, 66KV/11KV VOLTAMP make testing, commissioning, operation, routine maintenance activities.
? Power Transformer 2500 KVA, 11KV/415 V VOLTAMP make testing, commissioning, operation, maintenance activities.
? Maintenance of different sizes of single phase and three phase motors up to 500 HP.
? Motor load checking, overhauling, bearing replacement, vibration checking etc.
? Motor Starters installation and maintenance of L& T/Siemens make DOL, fully Automatic Star - Delta starter etc.
? Maintenance of VCB, ACB and MCCBs.
? Monitoring the DG sets regular maintenance activities and synchronizing of Generators and load sharing of generators.
? Management of 2000 KVA unbalanced voltage stabilizer Installation, testing, commissioning and maintenance activities.
? substation to different plant process and utilities areas.
? Co-ordination with local Electricity government authorities for approvals and power demands, maintenance etc.
? Preparation of shut down planning and management of manpower and material as per schedules.
? Inventory management control, updating stocks and create the request for required materials.
? Implementing the cost reduction activities by improving the power factor of GEB incoming power for electricity bills reduction.
? Reduction of cost activities by changing diesel generator (DG) fuel from HSD to LDO.
----------------------------------------------------------------------------------------------------------------------------------
Sept, 1997 ~ Oct 2001 Electrical Engineer / Subcontractors of Reliance Petroleum.

Reliance Petroleum Ltd. Jamnagar
? Estimation of Man hours for Erection and Pre-commissioning and Commissioning Activities.
? Preparation of Pre-commission and commissioning procedures.
? Installation and Testing of Medium Voltage Switchgear Panels ( Relay testing, Insulation resistance, DUCTOR Test, HIPOT test and etc)
? High Voltage (HV) & Low Voltage (LV) Panel testing
? Installation, Pre-commissioning and commissioning of Low Voltage motors (LV), Medium Voltage (MV) Motors (winding resistance Insulation resistance Test)
? MV and LV Motor Solo run test, Load trial, Vibration and Temperature monitoring for winding and bearings.
? Installation of Cables and testing Winding Resistance and Insulation Resistance Test
? HIPOT test of HV & LV panel & cables
? ACB, VCB functional Testing, Annunciation Panel testing.
? Relay testing, , Insulation Resistance test of motors & cables
? Mechanical Operation test of Circuit Breaker & Earth switches
? Function & Interlock checking of 11KV/6.6 KV, 415 Volts panels.

----------------------------------------------------------------------------------------------------------------------------------
S U M M A R Y O F W O R K E X P E R I E N C E

(1) GS Engineering & Construction India Pvt. Ltd./October 2013 – Present
(2) Global PETROPROJECT Services (SAIPEM Group Company)/ ERSAI Caspian contractor LLC.KAZAKHSTAN./ August 2010 – March 2013
(3) MEDGULF Construction Co. WLL, Qatar /Feb 2008 – Feb 2010
(4) ALMEER Technical Services WLL , Kuwait / Dec 2006 – Jan 2008
(5) NIRMA LTD, Baroda / Jan 2004 – Nov 2006
(6) Gujarat Glass PVT. Ltd. JAMBUSAR, Baroda / Oct 2003 - Jan 2004
(7) ADANI WILMAR Ltd , MUNDRA Kutch / Oct 2001 - Sept 2003
(8) Reliance Petroleum Refinery, JAMNAGAR / Sept 1997-Sept 2001
----------------------------------------------------------------------------------------------------------------------------------









--------------------------------------------------------------------------------------------------------------------------------
PERSONAL INFORMATION
----------------------------------------------------------------------------------------------------------------------------------
Date of birth 2-April-1976
Languages English, Hindi & Gujarati.
Education / Qualification B. E. (Electrical)
S.P. University 1997, Gujarat, India.

Passport Number G9808445
Passport validity 15-OCT-2018
Place of Issue of Passport Doha-Qatar

----------------------------------------------------------------------------------------------------------------------------------------
?

? ETAP (Certification from Company)
? Windows 2007 (Ms office, Ms word, Power point)
? AutoCAD 2012
? Lighting Software DIALUX
? Lighting Software RELUX
? 3D Model Nevis

--------------------------------------------------------------------------------------------------------------------------------
TRAINING
----------------------------------------------------------------------------------------------------------------------------------
? Caterpillar DG Sets Management Programmer. Ahmadabad
? ETAP at Mumbai, India