ORGANISATIONAL SCAN
________________________________________
Since June’13 till to date: TECHNOFIT GULF, OMAN as PROJECT MANAGER
Project: Mechanical and Electrical Projects
Key Assignments:
? Managing the full project operation
? Business development
? Project Strategy & Execution Plan
? Attending to day to project progress and site operation issues
? To make sure project schedule is kept on time.
? To prepare project costing
? To make sure project cost is within the budget
? Attending meeting with clients
? Reporting the Technofit Gulf progress to Technofit Malaysia Management
? Attending safety meeting
Significant Highlights:
? Holds the distinction of administering entire project operations worth for OMR 550,000.000.
? Steered initiatives to execute projects on time and within budgets.
? Stellar in achieving cost reductions worth 10%
Since Oct’09- May’13: SABIC Engineering & Project Management, Jubail, Saudi Arabia as Project Leader
Joined as Lead Project Engineer (E&PM)
Key Assignments:
? To Carry out Feasibility Study
? Project Strategy & Execution Plan
? Design Basis and Basic Design
? Petrokemya Power Expansion Project One Unit 230kV GIS Sub-Station 9 Bay.
? 2 Units 230/34.5kV each sub-station is installed with 14 switchgear.
? 230kV cable modification from Oil Fill Cable to XLPE Cable.
? Modification of 230kv cablw from Oil fill to XLPE.
Significant Highlights:
? Holds the distinction of administering entire project operations worth for 115 million USD.
? Steered initiatives to execute projects on time and within budgets.
? Stellar in achieving cost reductions worth Rs. 5M.
Nov’06-Dec’08: Rotary Mec, Sudan as Senior Electrical Engineer
Project: Maintenance package field surface high voltage equipment and White Nile (5B) Petroleum Operating Company Ltd., Sudan
Key Assignments:
? Maintenance and inspection of:
o SF6 33kV Circuit Breakers.
o 11kV Vacuum Circuit Breaker.
o 6.6kV Vacuum Circuit Breakers.
o 400VCB and 400ACB.
o HV Motors 6.6kV.
o 6 Oil Gathering Manifolds (OGM) Ring Main Unit (RMU) 33/0.42kV and Compact Substation.
o 28 well heads Ring Main Unit (RMU) 33/0.42kV and Compact Substation.
o 48kM Transmission Line.
o 4 Units of Step-up Transformers 20/25MVA 11/33kV.
o Transformers 10/12.5MVA 33/11kV.
o Transformers 10/12.5 MVA 11/6.6kV.
o Distribution Transformers 1600kVA 6.6/0.42kV and NER.
o Transformers Oil Filtration.
Jan’05-Sep’06: MUHIBBAH Petrochemical Engineering SDN BHD as Project Manager
Project: EPCC of Package 3- Field Surface Facilities for Thar Jath Development; White Nile (5B) Petroleum Operating Company Ltd, SUDAN
Key Assignments:
? Installation of:
o SF6 33kV Circuit Breakers.
o 11kV Vacuum Circuit Breaker.
o 6.6kV vacuum circuit Breakers.
o 400VCB and 400ACB.
o VSD & UPS.
o Cable System for HV Motors 6.6kV.
o 6 Oil Gathering Manifolds (OGM) Ring Main Unit (RMU) 33/6.6kV and Compact Substation.
o 28 well heads Ring Main Unit (RMU) 33/6.6kV and Compact Substation.
o 48kM Transmission Line.
o 4 Units of Step-up Transformers 20/25MVA 11/33kV.
o Transformers 10/12.5MVA 33/11kV.
o Transformers 10/12.5 MVA 11/6.6kV.
o Transformers 1600kVA 6.6/0.42kV.
o NER.
o Oil Filtration.
? Laying and termination of control cables and power cable.
Jan’03-Dec’04: Trenergy FPSO Perintis Operating Company, as Head - Electrical Engineer
Key Assignments:
? Maintenance and Inspection of:
o 11kV Vacuum Circuit Breaker.
o 6.6kV Vacuum Circuit Breaker.
o 400VCB and 400ACB.
o VSD & UPS.
o Transformers 1600kVA 415kVA/11kV.
o Transformers 1600kVA 6.6/0.42kV.
o Gen Set Electrical System.
o HV Motors 6.6kV and Pumps.
Feb’98-Dec’02: Rotary MEC (M) SDN BHD, Sarawak Malaysia as Project Engineer
Project: MLNG 3 Electrical maintenance testing and commissioning
Key Assignments:
? Routing maintenance, inspection, servicing and overhauling of:
o 33kVVacuum Circuit Breaker.
o 33kV Vacuum Circuit Breakers.
o 11kV Vacuum Circuit Breaker.
o 11kV Vacuum Circuit Breakers.
o 6.6kV Vacuum Circuit Breaker.
o 6.6kV Vacuum Circuit Breaker.
o 400VCB and 400ACB.
o HV Motor and pumps 6.6kV.
o 400VCB and 400ACB.
o VSD.
o 30MVA 33/11kV Transformers.
o 10MVA 11/ 6.6kV.
PREVIOUS ASSIGNMENTS
________________________________________
Dec’94-Jan’98: National Electricity Board of Malaysia as Maintenance Engineer
Sep’92-Nov’94: National Electricity Board of Malaysia as Project Engineer - Sub-Station Projects
Installation of High voltage electrical equipment for two units 275/132/33/11kV Gas Insulated Sub-Station (GIS)
Jul’90-Aug’92: National Electricity Board of Malaysia as Project Engineer - Sub-Station Projects
Project: Installation of High Voltage Electrical Equipment for Two Units 275/132/33/11kV Sub-Station
Oct’87-Jun’90: National Electricity Board of Malaysia as Electrical Engineer (Sub-Station Projects)
Project: Installation of High Voltage Electrical Equipment for Three Units132/33/11kV Sub-Station
Aug’86-Sep’87: National Electricity Board of Malaysia as Electrical Engineer - Sub-Station Projects
Project: Installation of High Voltage Electrical Equipment for Three Units indoor 33/11kV Sub-Station
Apr’81-May’83: National Electricity Board of Malaysia as Electrical Technician
PROFESSIONAL TRAININGS
________________________________________
? ABB High Voltage Equipment Training
? Cable Termination Training
? Heath & Safety Training and Offshore Safety
ACADEMIC CREDENTIALS
________________________________________
1986 Bachelor of Engineering - Electrical from Anna University of Chennai, India
Secured 65%
Other Technical Qualifications: Diploma in Electrical from Technician Institute Latihan Sultan Ahmad Shah Lembaga, Letrik Negara
IT FORTE: Conversant with MS Office (Word & Excel), Project Schedule, CMMS and Internet Applications
________________________________________