Current Assignment:
Working with M/S. SARAFOAM Ltd. As a Technical Manager (from 18th Feb.2013 to continue). Successfully completed first two years contract.
Manufacturer of Foam, Foam sheet, Mattress and pillows. Responsible for all equipment day to day maintenance, preventive
and breakdown maintenance. (Mechanical, electrical and Chilling chemicals.)
New projects plant maintenance which includes.
1. Cannon Viking Foam production machine.
2. Chemical pumps.
3. Chillers.
4. Kul-ting machine.
5. Rotary machine.
6. Vertical machine.
7. Fiber machine.
8. Crumbing.
9. Water treatment plant.
10. DG and compressors.
Worked with M/s. Glass force Ltd. (ISO 9000) Aba, Nigeria. From 27 Mar.2005 to 15Feb. 2013 as a Maintenance Manager
(Mechanical & Utilities) Manufacturer of Glass Bottles (Glass Technology & Machinery supplied by BDF, Italy) as a
HOD- Mechanical & Utilities since March 2005(Completed successfully 8 years) and fully responsible for New Project plant maintenance which includes.
1. 1750 KW X 2 (QSV-91-G) Gas Generators (Cummins)
2. 1650 KW X1 (QSK-60) Diesel Generator (Cummins)
3. 800 KW X1 (QST-30) Diesel Generator (Cummins)
4. 800 KW X1 Perkins Diesel Generator.
5. Batch Plant (USSR.)
6. Layers.
7. IS. Machine. (Partially.)
8. Furnace (All Mechanical.)
9. COLD END-Inspection Machine, palletize & Hooder (MSC. France)
10. Air Compressor (Centrifugal) Ingersoll-Rand, Italy.
11. Gas Compressor.
12. Pay-Loader (Cat-966F)
13. Forklift X6 (Fenwick Lind, France) Diesel & Gas.
14. Man Diesel Tipper, Nissan Jeep, Toyota Bus.
15. Workshop.
Erection and commissioned 39000 Liters X 2 No. LPG Gas Tanks, its pipe lines & Auxiliaries.
In this assignment 27 staffs working under my supervision & I am direct responsible to the General Manager of the plant.
Professional Training
Course on Conduct By
Kirlosker DG. W4AG, W8V (MAN) M/s Kirlosker, India.
Skoda DG M/s Prexim Diesel, India.
Management Training (in house) M/s Orissa Synthetics Ltd. India.
Worked with M/s. Century Polyester Plc. As a Manager Utility (an ISO 9002 company).Lagos, Nigeria. Other than routine and
preventive maintenance in plant, overhauling of 1450KVA X 2 DG Set, Boiler, AIR Compressors, and Forklift etc. I am associated
with installation & commissioning of Nonwoven plant and Heavy Machinery along its building construction (Iron Beams, Column and Foundation)
for polyester yearn manufacturing also converted 02 no. Loos Boiler from AGO to BLACK Oil along with oil lines and tank farm.
Worked from 10 Feb. 2000 to 18 Aug. 2004 with Century Polyester Plc, Lagos, Nigeria (an ISO 9002 company) manufacturing of polyester
staple fiber & Non woven product (Zimmer Technology & machinery supplied by Fleissner) as HOD-Mechanical & Utilities since Feb.
2000 (completed successfully Four –and-a-half year contract), and totally responsible for plant maintenance which includes,
1. DG 1450 KVA X 2
2. Loos Boiler (2 ton 28 bar.)
3. Mechanical Maintenance of the plant (spinning, Fiber Line, Baler & its Auxiliary etc.
4. Water Treatment Plant.
5. Commercial negotiation with vendors.
6. Air Compressor (Atlascopco)X 3
7. Forklift (Toyota, Balkanker) X 5
8. Work Shop.
In this assignment 40 staff was working with me. I was directly responsible to the Chief Executive works of the plant.
Experience (31 years):
a) M/S. SARAFOAM Ltd.
Position : Technical manager
Period : 2013 to continue.
Particular :
1. Day to day Maintenance of foam Production Machine, rotary, Vertical cutting, Fiber, Kul-ting,
Crumbing and Tape edge Machine along with procurement Of spare parts. Project execution.
b) M/S GLASSFORCE LTD.
Position : Maintenance Manager (Mechanical & Utility)
Period : 2005 to 2013.
Particular :
1. Day to day maintenance of the Glass plant, Power house, Air Compressor, Cold end Inspection
Machine, Palletize, Hooder, Batch Plant, Furnace and Project.
2. Procurement & Inventory control.
3. Import substitution in house.
4. Workshop & Partially IS machine.
c) M/S Century Polyester Plc. (Nigeria).
Position :Manager (Utility& Mechanical)
Period :2000 to 2004
Particulars :
1. Promoted as HOD Mechanical & Utilities.
2. Day to day maintenance of the Fiber Plant, Power House, Compressors and WTP.
3. Procurement & Inventory control.
4. Man Power handling and Administration of dept.
d) M/S Reliance Industries Ltd. (Orissa Synthetics)
Position :Manager (Power House)
Period :1994 to 1999.
Particular :
1. Joined as Deputy Manager- Power House
2. Promoted as Manager Power house
3. Day to day Maintenance of DG set 2270kva x 5 with over hauling.
4. Procurement & Inventory control.
5. Man power handling and Administration of dept.
6. WTP Plant.
e) M/S Rai & Sons, kolkata
Position :Service Engineer (DG)
Period :1990 to 1994
Particulars :
1. Erection, commissioning and Overhauling of CKD Skoda DG, DG set up to 3250KVA.
2. Import Substitution.
f) M/S NSB Technical Industrial service Ltd, Kolkata.
Position Service Engineer (DG)
Period 1984 to 1990
Particular
1. Joined as a trainee engineer 1984.
2. Responsible for erection Commissioning of Man, Parkins Kirlosker DG set in Indian Navy
As well as Industries.